What causes disruption

Bounced email usually comes down to a mistake in the DNS settings, specifically the MX record.

An MX record works like a delivery address that tells the internet which server should receive email for your domain. If the old address is removed before the new one is ready to receive, or if the DNS transition period drags on, incoming email cannot find its destination.

Three stages of a migration with no downtime

An email migration is never done all at once in a single night. We split it into three stages:

Stage 1: Preparation and initial sync

Before touching any DNS configuration, the new environment has to be fully ready.

  1. Creating accounts on the destination platform. All user accounts, group addresses such as sales@ and info@, and all aliases are created on the destination platform first.
  2. Initial sync. The old and new servers are connected through a migration protocol, whether IMAP, EWS, or an API, and 90 to 99 percent of the old email data is copied into the new mailboxes. This runs in the background, and users keep working on the old server as usual.

Stage 2: TTL adjustment and cutover preparation

So that the MX record change causes no gap, the spread of the DNS change has to be sped up first.

  1. Lowering the TTL. The TTL sets how long servers on the internet cache your MX record, and it is usually set to 24 hours. A few days before the cutover, we lower it to 5 minutes, or 300 seconds.
  2. Setting the cutover schedule. The cutover is done during the hours with the lowest email traffic, usually at night on a weekend.

Stage 3: DNS cutover and catch-up sync

This is the stage where the move actually happens.

  1. Changing the MX record. At the scheduled time, the MX record is switched to the new platform. Because the TTL has been lowered to 5 minutes, the change spreads within minutes.
  2. Catch-up sync. During that short propagation window, some email still arrives at the old server. We pull that remaining email into the new server with a catch-up sync.
  3. Go-live. Users log in to the new system on the next working day, with their old email intact and any new email already in their new mailboxes.

Preparing your team

A migration succeeds on more than the technical side. It also depends on how well the team is prepared. Make sure you:

  • Announce the migration schedule to all employees.
  • Share temporary credentials (a new password) and login instructions before the day itself.
  • Set up one quick communication channel, such as a WhatsApp group, for users who have trouble logging in on the first day.

Conclusion

With careful preparation, correct DNS settings, and a catch-up sync, a move between email platforms can go by without users noticing.

If you are planning to move your company's email system to a new platform, we can draw up the plan together with your team.

Talk to us about email migration on WhatsApp

Share article

Written by

JasaKonfig Team

The JasaKonfig team handles implementation, migration, and storage for companies in Indonesia. Questions? [email protected]